Replacing The Controller Module - Bosch DVA-16K SCSI Installation Manual

Raid subsystem scsi premium series
Hide thumbs Also See for DVA-16K SCSI:
Table of Contents

Advertisement

44
en | Subsystem Maintenance
Fig. 6.2 Removing the Controller Module
6.2.3

Replacing the Controller Module

If the controller module itself has failed, it must be replaced. To replace a failed controller
module:
1.
2.
3.
Fig. 6.3 Installing the Controller Module
4.
Fig. 6.4 Lifting the Controller Module Latches Upward
5.
F.01U.027.799 | V2 | 2008.08
Levers
Levers
Remove the controller module from the subsystem (see Section 6.2.2 Removing the Con-
troller Module.) If the DIMM module is undamaged it can be removed and reinstalled on
the new controller module. For instructions on removing and installing a DIMM module,
please see Section 6.3 DIMM Module Replacement.
Install the DIMM module onto the new controller module, making sure that the memory
module is securely in place. (See Section 6.3 DIMM Module Replacement)
Install the controller module. Make sure the levers at the back of the controller module
are down. Align the controller module with the controller module bay at the rear of the
subsystem. Gently slide the controller module in. (See Section 6.3 Installing the Controller
Module)
Levers
Levers
Reposition the controller module. Once fully inserted, lift up the levers at the back of the
controller module. This will set the controller module in the correct position. (See
Figure 6.4)
Levers
Levers
Secure the controller module to the subsystem. Install the two (2) screws on the levers
to secure the controller module in place. (See Figure 6.5)
RAID Subsystem DVA-16K | Installation Manual
Bosch Security System

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dva-16k series

Table of Contents