Installation Diagram; Copper Tubing - Daewoo DSB-181LH Owner's Manual

Split airconditioning system
Hide thumbs Also See for DSB-181LH:
Table of Contents

Advertisement

Below is an overview for the connection of the the Indoor unit to the Outdoor unit. The pages following will give detailed
instructions for full installation. Remember to read the complete Installation section and follow all the safety instructions
fully when installing the Indoor and Outdoor units.
OVERVIEW
This appliance must be installed according to national power supply acquirement.
10cm (3.95in) from
side wall
NOTES:
• After installation it must be pos-
sible for the user to disconnect
the power supply plug.
• If the AC outlet is a 3-pronged
type or other, have an electri-
cian install a new outlet.
• Contanct service man when
replace the power cord set.
• The specification of AC connec-
tion is 1.5mm
2
X 6P X6m.

INSTALLATION DIAGRAM

10cm (3.95in)
from ceiling
At least 30cm
(11.8in) from unit
AC Outlet
and Plug
Plug into 220V~240V
AC Outlet
23.6
inches
3.9 inches
23.6
inches
30cm (11.8in) from
side wall
Wall
Bracket
Pipes
(Not Supplied)
Maximum Height
Maximum Length
Any tube length between 7 and 15 meters must
be precharged with freon using the following calulation:
Adding additonal tubing will decrease efficiency
Connecting
5
Wall
Drain
Hose
Wall Cap
AC
Connection
(Not Supplied)
Wrap with
Tape
7M (21Ft)
15M (49Ft)
(Length – 5) x 30 grams
27.6
inches
Copper
Tubing
Ground Wire
(Not Supplied)
1/2" side piping
cable
1/4" side piping
Drain Hose
Drain
Hose

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents