Equipment Information

!
Measurements for the rack are given in Us where 1U is equal to 1.75 inches.
!
Every three holes on the inside of the rack are equal to 1U.
!
The height of the Server Small Tower Unit is 5Us (8.75 inches).

Preparing Your Server Unit

To prepare your server small tower unit for rack mounting, you must first
remove the front bezel, the side panels, and the four foot stands on the bottom of
the unit. After the previously mentioned items are removed, then the new front
bezel for rack mounting can be installed on the front of the server unit.

Removing the Front Bezel

If you are removing the front bezel after the server unit is set
up, you must first power off the system and all external
devices. Unplug the system power cord
The plastic front bezel assembly on your server unit is a one-piece assembly and
easy to remove.
1. Power off the server unit and ensure it is disconnected from the ac wall
outlet.
2. Remove the front bezel by carefully pulling it off the front of the server unit
chassis. Use an even amount of pressure around the edges of the bezel.
(see Figure 3).
! CAUTION
Note:
The front bezel is secured with six locking tabs.
Express5800/120Ed Rack Mount installation Procedures 7