Completing The Installation - Lenovo ThinkServer RD120 Type 6444 Installation Manual

Hide thumbs Also See for ThinkServer RD120 Type 6444:
Table of Contents

Advertisement

10. Firmly press the ServeRAID-8k SAS controller straight down into the connector
11. Remove the battery from the ServeRAID-8k SAS Controller package.
12. Slide the battery mounting tabs into the battery mounting clips on the server
13. Connect the battery to the ServeRAID-8k SAS Controller.
14. Replace the air baffle over the DIMMs. See the User Guide for more
15. Replace the riser-card assembly.
If you have other optional devices to install or remove, do so now. Otherwise, go to

"Completing the installation."

Notes:
1. When you restart the server for the first time after you install a ServeRAID-8k
2. When you restart the server, you will be given the opportunity to import the
Completing the installation
To complete the installation, complete the following steps:
1. Install the cover. See "Installing the cover" on page 31 for more information.
2. Install the server in the rack cabinet. See the Rack Installation Instructions that
30
ThinkServer RD120 Types 6444, 6445, 6446, and 6447: Installation Guide
1
RAID controller
2
Battery cable
3
Battery
9. Turn the new ServeRAID-8k SAS controller so that the keys on the bottom
edge align correctly with the connector.
by applying pressure on both ends of the controller simultaneously. The
retaining clips snap into the locked position when the controller is firmly seated
in the connector.
Note: If there is a gap between the controller and the retaining clips, the
controller has not been correctly installed. In this case, open the retaining clips
and remove the controller; then, reinsert the controller.
wall that is next to the ServeRAID SAS controller connector.
information.
SAS controller, the monitor screen remains blank while the controller initializes
the battery. This might take a few minutes, after which the startup process
continues. This is a one-time occurrence.
Important: You must allow the initialization process to be completed. If you do
not, the battery pack will not work, and the server might not start.
The battery comes partially charged, at 30% or less of capacity. Run the server
for 4 to 6 hours to fully charge the controller battery. The LED just above the
battery on the controller remains lit until the battery is fully charged.
Until the battery is fully charged, the controller firmware sets the controller
cache to write-through mode; after the battery is fully charged, the controller
firmware re-enables write-back mode.
existing RAID configuration to the new ServeRAID SAS controller.
come with the server for detailed information about how to install the server in a
rack cabinet.
4
Battery mounting tabs
5
Battery mounting clips
6
Battery cable connector

Advertisement

Table of Contents
loading

Table of Contents