Using This Guide
This guide contains information that helps you prepare your site for the installation of an
Express5800/1000 Series server. By following these site preparation guidelines, you can
help ensure a smooth and successful installation of your server. This guide is intended for
system administrators and facilities personnel who are preparing the site for installation of
an Express5800/1080Xd, 1160Xd, or 1320Xd Server.
Proper site preparation and maintenance are vital to the reliability of any computer system.
As our customer, it is your responsibility to ensure that the proper facility resources and
conditions are maintained. This will allow us to provide support services in accordance
with the NEC "ServerCare Service Warranty Program."
This guide includes:
A site planning overview
!
Facility requirements
!
Electrical requirements
!
Environmental requirements.
!
Who Should Use This Guide
This guide is intended for system administrators and facilities personnel who are preparing
the site for an Express5800/1000 Series server installation.
Symbols and Conventions
This guide uses the following text conventions and graphics symbols.
Warnings, cautions, and notes have the following meanings:
Warnings alert you to situations that could result in serious personal injury or loss
of life.
Cautions indicate situations that can damage the system hardware or software.
Note:
Notes give important information about the material being described.
!
WARNING
! CAUTION
Express5800/1080Xd/1160Xd/1320Xd Site Preparation Guide 1