IOM Instructions
HKV LArge CommerCiAL
Heat Controller, Inc.
Step 6: Move Bolt-Belt Adjustment ASM to opposite side and re-attach.
Step 6
Step 7: Put Belt back on and tighten.
Step 8: Place panels back on unit.
Put Control Box Cover and
Reverse steps to go from
Motor Cover on return side.
a front return to a back return.
Control Box Cover
Control Box
Motor Cover
Front Return Top Discharge
55