Pre-Lnstallation Checklist - GE ZET1 Installation Instructions Manual

30" built-in wall oven
Table of Contents

Advertisement

Installation Instructions
Pre-lnstallation Checklist
ALL INSTALLATION
INFORMATION
ON THE FOLLOWING
PAGES IS TO
BE USED FOR SINGLE AND DOUBLE
OVEN INSTALLATION!
Remove packaging materials.
Check behind hinges and under
false bottom. Remove labels on the
outside of the door, plastic on trims
and panel, all tape around the oven,
and any shipping screws securing
the oven to the base pad.
o _o
i
Rack Supports
_'
_
with Hex Nuts
G
Temperature
Probe
Oven Racks
/_,o_}_r_ _,_ _ ,Tq-_
_
Graphite
__1
Lubricant
Broiler Pan
and Grid
Literature
Pack
Open oven door and remove
literature pack, broiler pan and grid,
oven racks, rack supports and a bag
with 9 hex nuts.
Read Installation Instructions carefully
before you begin.
Be sure to place all literature, Owner's
Manual, Installations, etc. in a safe place
for future reference.
i4:.2:_72
. ............
(Continued on following page)

Advertisement

Table of Contents
loading

This manual is also suitable for:

Zet2

Table of Contents