Albany RCA L Owner's Manual page 31

Table of Contents

Advertisement

Service & Repair
6.
Mix the adhesive as per the manufacturer's instructions and apply a liberal coating to the
nylon cord fabric and the rough surfaces of the inlay rubber segments. Allow pieces to
dry to the touch (about 15 to 20 minutes) and apply a second coating. Allow to set until
tacky. Place the inlay segments into position and, using a rubber or rawhide mallet and
a steel buckler, impact the entire area of the patch repeatedly. A high degree of impact
ensures proper adhesion. Clamping is not acceptable. Allow the cement to cure
1
thoroughly (1-
/
7.
Finally, raise the curtain to an open position, re-insert it into the guides, close and re-bolt
the guides, and resume normal operation.
RCA L
to 2 hours) before moving the curtain.
2
Figure 31
Figure 32
31
Version 2.0

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents