Installation

5.1 Inspection of the shipment

The M&I Re-Coil-Away door is mostly pre-assembled before leaving the factory. The side
frames together with the top roll are attached to a pallet at the time of leaving the factory. The
door must be checked for possible transport damage and that all the components ordered
with the door are with it. Check against the order statements.

5.2 Installation preparations

Check the installation place with regard to the necessary fixing points and setup. If necessary
a support construction or other installation possibilities must be set up. The side frames
should be securing attached to a suitable mounting surface.
Insulated panel walls, honeycomb bricks and lightweight partition walls
must first be checked for installation use.
Clear dimensions (width and height) of the door opening should be measured and compared
with the order statements.
The installation location must be secured for passenger and automobile traffic.
Before installation the packing material must be removed.
Also lower the bottom beam below the idler barrel before lifting into place.