Start Up Form - RBI DOMINATOR Series Installation And Operation Manual

Dominator series finned copper gas boilers (model db) & water heaters (model dw)
Table of Contents

Advertisement

Date of Start Up:
Model #:
Boiler Model:
Dominator
Fuel Type:
Natural Gas
System Type:
Hydronic
PRE-START UP CHECK LIST
ANY VISUAL DAMAGE TO UNIT?
PIPING PROPERLY CONNECTED?
SYSTEM FLOODED AND FLOWING?
BOILER CIRCULATOR WIRED?
VENT/STACK CONNECTED?
IS VENT VERTICAL THROUGH THE ROOF?
IS VENT THROUGH THE WALL?
IS POWER VENT INSTALLED AND WIRED?
SEALED COMBUSTION?
ELECTRICAL/WIRING/CONTROL
Boiler Supply Voltage
Boiler Pump Supply Voltage
Voltage Down Stream of Transformer
BTC CONTROL SET UP:
: Mode
: Boiler Target
: Tank Target
: Tank Diff
: Outdoor Start
: Boiler Start

START UP FORM

Propane
Domestic
: Boiler Max
: Boiler Min
: Boiler Diff
: Intr-Stg Diff
: Intr-Stg On Dly
: Intr-Stg Off Dly
Job Name:
Serial Number #:
Company Name
Tech Name
Phone Number
INLET FILTER INSTALLED AND CLEAN?
ALL WIRING CONNECTED PROPERLY?
BOILER PUMP PUMPING INTO INLET?
COMBUSTION AIR PROVIDED?
PROPER SERVICE CLEARANCE PROVIDED?
OUTDOOR AIR SENSOR INSTALLED/WIRED?
ARE UNITS RACKED?
IS RACK ASSEMBLED TIGHTLY?
NO HOLES SCREWED INTO CABINET?
External BMS System
Utilize Boiler BTC For Control
Page 47
: Purge ΔT

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents