Start Up Sheet; Start Up Form - RBI LCD Series Installation & Operation Manual

Lcd series finned copper gas boilers (model lb) & water heaters (model lw)
Hide thumbs Also See for LCD Series:
Table of Contents

Advertisement

Page 44
Date of Start Up:
Model #:
Boiler Model:
Dominator
Fuel Type:
Natural Gas
System Type:
Hydronic
PRE-START UP CHECK LIST
ANY VISUAL DAMAGE TO UNIT?
PIPING PROPERLY CONNECTED?
SYSTEM FLOODED AND FLOWING?
BOILER CIRCULATOR WIRED?
VENT/STACK CONNECTED?
IS VENT VERTICAL THROUGH THE ROOF?
IS VENT THROUGH THE WALL?
IS POWER VENT INSTALLED AND WIRED?
SEALED COMBUSTION?
ELECTRICAL/WIRING/CONTROL
Boiler Supply Voltage
Boiler Pump Supply Voltage
Voltage Down Stream of Transformer
BTC CONTROL SET UP: (Not all settings are used for every mode. (Dominator Series Only))
: Mode
: Boiler Target
: Tank Target
: Tank Diff
: Outdoor Start
: Boiler Start

START UP FORM

LCD
Propane
Domestic
: Boiler Max
: Boiler Min
: Boiler Diff
: Intr-Stg Diff
: Intr-Stg On Dly
: Intr-Stg Off Dly
Job Name:
Serial Number #:
Company Name
Tech Name
Phone Number
INLET FILTER INSTALLED AND CLEAN?
ALL WIRING CONNECTED PROPERLY?
BOILER PUMP PUMPING INTO INLET?
COMBUSTION AIR PROVIDED?
PROPER SERVICE CLEARANCE PROVIDED?
OUTDOOR AIR SENSOR INSTALLED/WIRED?
ARE UNITS RACKED?
IS RACK ASSEMBLED TIGHTLY?
NO HOLES SCREWED INTO CABINET?
External BMS System
Utilize Boiler BTC For Control
: Purge ΔT
LCD ONLY
: Operator (STG1)
: High Operator (STG 2)
: High Limit
: Pump Purge