Table Of Contents; Before Your Start - RBI FUTERA II Series Installation And Operation Instructions Manual

Futera ii series finned copper tube gas boilers (fb) & water heaters (fw)
Hide thumbs Also See for FUTERA II Series:
Table of Contents

Advertisement

FUTERA II INSTALLATION AND OPERATION INSTRUCTIONS
CONTENTS
BEFORE YOUR START . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2
RATINGS & CAPACITIES . . . . . . . . . . . . . . . . . . . . . . . . . . 3
BOILER/WATER HEATER LOCATION . . . . . . . . . . . . . . . 3
COMBUSTION AIR & VENTILATION . . . . . . . . . . . . . . . . . 3
GENERAL VENTING GUIDELINES . . . . . . . . . . . . . . . . . 5
OUTDOOR VENTING . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13
COMMON VENT SYSTEMS . . . . . . . . . . . . . . . . . . . . . . . 14
GENERAL PIPING REQUIREMENTS . . . . . . . . . . . . . . 14
HEATING SYSTEM PIPING . . . . . . . . . . . . . . . . . . . . . . . 16
DOMESTIC WATER SUPPLY PIPING . . . . . . . . . . . . . . 20
GAS SUPPLY PIPING . . . . . . . . . . . . . . . . . . . . . . . . . . . . 24
ELECTRICAL WIRING . . . . . . . . . . . . . . . . . . . . . . . . . . . . 25
GENERAL OPERATION . . . . . . . . . . . . . . . . . . . . . . . . . . 25
OPERATING INSTRUCTIONS . . . . . . . . . . . . . . . . . . . . . 25
CHECKING & ADJUSTMENTS . . . . . . . . . . . . . . . . . . . . 27
CONTROL DESCRIPTION . . . . . . . . . . . . . . . . . . . . . . . . 29
DIAGNOSTICSPAGE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 30
MAINTENANCE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 31
TROUBLE-SHOOTING . . . . . . . . . . . . . . . . . . . . . . . . . . . 33
REPAIR PARTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 34
START UP SHEET. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 41
MASS CODE PAGE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 44
WARRANTY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 46
BEFORE YOU START
This manual covers the application, installation, operation
and maintenance of a Futera II Series finned copper
heating boiler/water heater/pool heater.
To obtain the safe, dependable, effi cient operation and long
life for which this heating boiler/water heater was designed,
these instructions must be read, understood and followed.
The Futera II Series finned copper heating boiler/water
heaters have been design certified by CSA for use with
natural and propane gas under the latest revision of
ANSI-Z21.10.3/CSA 4.3, Gas Water Heaters, ANSI-Z21.13/
CSA 4.9, Gas-Fired Low Pressure Steam and Hot Water
Boilers ANSI-Z21.56/CSA 4.7 Gas Fired Pool Heaters and
CAN1-3.1, Industrial and Commercial Gas Fired Packaged
Boilers. Each unit has been constructed and hydrostatically
tested for a maximum working pressure of 160 psi,
1103 kPa in accordance with Section IV of the A.S.M.E.
Boiler and Pressure Vessel Code.
All aspects of the boiler/water heater installation must
conform to the requirements of the authority having juris-
diction, or, in the absence of such requirements, to the
National Fuel Gas Code, ANSI Z223.1/NFPA 54-latest
revision. Where required by the authority having jurisdiction,
the installation must conform to the Standard for Controls
and Safety Devices for Automatically Fired Boilers, ANSI/
ASME CSD-1.
In Canada, the installation must be in accordance with the
requirements of CSA B149.1 or .2, Installation Code for
Gas Burning Appliances and Equipment.
If installed in the Commonwealth of Massachusetts, you
MUST FOLLOW the additional instructions located in the
back of this manual (MACODE-3).
The owner should maintain a record of all service work
performed with the date and a description of the work done.
Include the name of the service organization for future
reference.
Direct all questions to your RBI distributor or contact the
RBI Customer Service Department at:
U.S. -
260 North Elm Street
Westfi eld, MA 01085
Canada -
7555 Tranmere Drive
Mississauga ONT L5S 1L4
Always include the model and serial numbers from the
rating plate of the boiler/water heater in question.
2

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents