The Meter Structure; A.the Meter Front Structure - UNI-T UT232 Operating Manual

Table of Contents

Advertisement

Model UT232: OPERATING MANUAL

The Meter Structure

A. The Meter Front Structure (see figure 1)
Figure 1
Black
Red
Blue
Yellow
1
Transformer Jaw: designed to pick up the AC
and DC current flowing through the conductor.
It could transfer current to voltage. The tested
conductor must vertically go through the Jaw
center.
2
Hand Guards: to protect userís hand from
touching the dangerous area.
3
Power button
4
Max/
button
5
MENU button
6
LOAD button (recall data)
7
SELECT button (press to select alternate
function and sum of Watts measurement)
8
MIN/
button
9
V3 Input Terminal (Third phase measurement)
10
V2 Input Terminal
(Second phase measurement)
11
V1 Input Terminal (First phase measurement)
12
COM Input Terminal
13
CLEAR button (maximum and minimum)
7

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents