Figure 14
STEP 5: INSTALL DRAIN LINE
Condensate line routing options are shown below. Choose the one that best suits your installation. Never run the
condensate line as shown in Option 4 below, as the drain line will come into contact with the factory-installed
isolators beneath the unit.
IMPORTANT: The drain pan and line must be kept free from debris. Prior to installing the chassis ensure that there are
no blockages in the drain pan or line.
12
Option 1
Run condensate line
to right of unit
Option 3
Run condensate line
to left of unit
Option 2
Run condensate line
beneath unit platform
Option 4
Do not run
condensate line
back toward unit