Download Print this page

Dodge 3500 Ram Chassis Cab vehicle Operations & Installation Manual page 17

2011 chassis cab

Advertisement

2011 Chassis Cab PTO Operation & Installation Guide
5. Remove the fasteners and sealer from around the patch panel. Cut away the sound
deadener pad to expose the transmission PTO access.
6. You are now able to install and assemble the PTO and pump through the opening.
Note: larger pumps must be inserted through the hole and moved toward the rear of
the opening before installing the PTO. The pump is then slid forward to connect to
the installed PTO.
7. To assemble, reverse the above procedure using RTV to reseal the PTO floor pan
patch panel.
01/22/2010
-
-
+
+
ALL
ALL
IN
IN
OUT
OUT

Advertisement

loading