Equipment Checklist; Package Contents; Optional Rack-Mounting Equipment - Foundry Networks EdgeIron 2402CF Installation Manual

Foundry networks edgelron installation guide
Table of Contents

Advertisement

I
N STA LLIN G T H E
suppressor is recommended.

Equipment Checklist

After unpacking the switch, check the contents to be sure you
have received all the components. Then, before beginning the
installation, be sure you have all other necessary installation
equipment.

Package Contents

24-Port Fast Ethernet Switch
Four adhesive foot pads
Bracket Mounting Kit containing two brackets and four
screws for attaching the brackets to the switch
Power Cord
RS-232 console cable
Stacking Cable
CD-ROM containing installation guide and user guide

Optional Rack-Mounting Equipment

If you plan to rack-mount the switch, be sure to have the
following equipment available:
Four mounting screws for each device you plan to install in a
rack—these are not included
A screwdriver (Phillips or flathead, depending on the type of
screws used)
4-2
S
W ITC H
© 2003 Foundry Networks, Inc.
February 2003

Advertisement

Table of Contents
loading

Table of Contents

Save PDF