Chapter 3 Operation; Power On; Diagnostics; Normal Operation - Allied Telesis CentreCOM AT-3675 Bridge User Manual

Snmp-manageable bridge
Hide thumbs Also See for CentreCOM AT-3675 Bridge:
Table of Contents

Advertisement

Chapter 3
Operation

Power On

Diagnostics

Normal Operation

This chapter describes the features of the CentreCOM AT-3675 SNMP-
Manageable Learning Bridge and shows the basic operating procedures. It
covers how the bridge can be used to overcome common physical limitations
and how to employ the bridge in such a way that network performance is
improved.
When the power is first applied, the green System Power and red Diagnostics
indicators are illuminated. The green network Activity indicators are OFF.
The AT-3675 bridge executes a comprehensive set of diagnostics when the
power is first applied. The red diagnostic LED stays ON and the port's
Receive and Transmit indicators flash as the tests are executed. The
Diagnostic indicator turns OFF after successful completion of the tests. If
any tests fail, the Diagnostic indicator remains ON. In the latter case, the
bridge should be returned for service. Refer to the inside back cover for the
ATI location near you.
Under normal operation, the green Activity indicators reflect the reception
and transmission of data packets, as summarized in Table 5.
Indicator
Transmit
Receive
Table 5: Activity LEDs
Meaning When ON
Channel is Forwarding a Packet
Channel is Receiving a Packet
9

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the CentreCOM AT-3675 Bridge and is the answer not in the manual?

Table of Contents