Operational Calibration - Teledyne 7320 Operating Instructions Manual

Infrared gas analyzer
Table of Contents

Advertisement

3 Start-up and Theory of Operation
and the sample flow between 0.1 to 0.6 SCFH (50-250 cc/min) .
Zero standard gas must have a composition similar to sample, an ideally,
contains none of the components of interest.
Initialize a zero operation through the system menu. Refer to Section 4
for Electronics /Control Unit Modes and Functioning to navigate the zero
menu.
After the zero cycle is over, the instrument is not yet calibrated. Permit
the instrument to operate in this mode for at least 3 hours to stabilize if not
already done so upon initial power up. Repeat Zero Calibration followed by
a Span Calibration.
NOTE: The following options could be included in your system:
In case the instrument is part of a multi instrument system, where all
instruments are connected to the same sample system and under control of a
single timer, all instruments of the system will go through the zero and
sample cycle simultaneously. The Control Unit of the instrument which
houses the timer and operates the sampling system is called the master. The
other Control Units of the other instruments are called slaves.
Each of the other instruments may be monitoring the concentration of
several different gases of interest in the sample, for example CO, CO2 and/or
Combustibles as CH4 in flue gas.

3.2.2 Operational Calibration

After the instrument has stabilized, let zero gas flow through the
analyzer
Perform a zero of the analyzer.
Perform a span of the analyzer.
After the Zero operation, and the analyzer return to Sample,
open the span gas tank and set the pressure regulator to 20 psig
and perform a Span calibration.
Switch the mode switch to sample. Refer to Section 4 again.
Induce an automatic zero cycle as described in Section 4 also.
After the zero cycle, the analyzer reverts to the sample cycle. The
sample reading is now accurate and the analyzer is placed in continuous
operation. See Sections 4.6-4.8.
NOTE: In case slave analyzers are involved, calibrate them
simultaneously with the master analyzer.
After the instrument is calibrated, when no Auto-Cal option was
selected, shut off the main valve on the span and zero gas tanks. These tanks
3-2
Teledyne Analytical Instruments
Model 7320

Hide quick links: