Advertisement

MAINTENANCE
SERVICE INTERVALS
ACV recommends that boilers should be serviced at least once a year.
The burner must be serviced and tested by a competent engineer.
If a boiler is subject to heavy use, it may require servicing more than
once a year - consult ACV for advice.
Casing top panel
Burner chamber plate
20
SERVICING THE BOILER
1. Turn OFF the on/off switch on the boiler control panel and isolate
external electrical supply.
2. Turn off the gas or oil supply to the boiler.
3. Remove the flue to gain access to the top of the boiler.
4. Remove the casing top panel and lift off the flue reduction collar
by undoing the fastening bolts.
5. Remove the turbulators from the flue pipes for cleaning.
6. Unscrew the burner chamber plate and remove the burner.
7. Brush the flue pipes .
8. Clean the burner chamber and the burner.
9. Re-assemble turbulators, flue reduction collar and flue, checking
that the gasket on the flue reduction collar is in good condition.
Replace gasket if necessary.
Chimney flue
Flue reduction collar
Flue pipe and turbulators
Burner chamber

Advertisement

Table of Contents
loading

Summary of Contents for ACV HM 60 N

  • Page 1 SERVICE INTERVALS SERVICING THE BOILER ACV recommends that boilers should be serviced at least once a year. 1. Turn OFF the on/off switch on the boiler control panel and isolate The burner must be serviced and tested by a competent engineer.
  • Page 2 2. Close the isolating valves (4). 3. Connect a hose to the drain cock (7). SPARE PARTS 4. Open the drain cock to drain the primary circuit. Plese refer to the specific document available from ACV or your distributor.
  • Page 3: Using The Boiler

    USER GUIDE USING THE BOILER Control panel HeatMaster 60 N Combined temperature Manual reset high and pressure gauge limit thermostat Your system should be serviced at least once a year by a qualified engineer. Burner If the boiler is subject to heavy use, it may require lockout Time clock servicing more than once a year - consult your service...
  • Page 4: Heating System Pressure

    USER GUIDE Heating system pressure HeatMaster 70 N and 100 N From time to time you may need to top up the heating system pressure. This pressure is indicated by the combined temperature and pressure gauge on the boiler control panel.
  • Page 5: Burner Troubleshooting

    USER GUIDE RESETTING THE PRESSURE JET OIL OR GAS BURNER • HM 60 N and HM Jumbo 150 the lockout indicator is situated on the burner. • HM 70 N and 100 N the lockout indicator is situated on the burner and on the control panel.
  • Page 6: Service Record

    SERVICE RECORD INSTALLATION DETAILS Date installed : Flue gas T° : Model : % CO Efficiency : Serial number : (min. load) % CO Gas pressure : Heating system pressure setting : (max. load) Name and signature : SERVICE RECORD Date serviced : Flue gas T°...
  • Page 7 SERVICE RECORD Date serviced : Flue gas T° : Remarks : % CO Efficiency : (min. load) % CO Gas pressure : (max. load) Name and signature : Date serviced : Flue gas T° : Remarks : % CO Efficiency : (min.
  • Page 8 E-MAIL: ceskarepublika.info@acv-world.com E-MAIL: nederland.info@acv-world.com FAX:+44 1383 82 01 80 E-MAIL: uk.info@acv-world.com DEUTSCHLAND POLAND ACV WÄRMETECHNIK GMBH & CO KG ACV POLSKA sp. z.o.o. GEWERBEGEBIET GARTENSTRASSE UL. WITOSA 3 TRIANGLE TUBE PHASE III D-08132 MÜLSEN OT. JACOB - DEUTSCHLAND 87 - 800 WWOCWAWEK - POLAND FREEWAY CENTER - 1 TRIANGLE LANE TEL.:+49 37601 311 30...

This manual is also suitable for:

Heatmaster 100 nHeatmaster 150 jumboHeatmaster 60 nHm 70 nHeatmaster 70 n

Table of Contents