BOTTOM LAYOUT
Sump o-ring is placed between the sump
and the inner tub in order to prevent
leakage
1
4
5
Drain pump group should be fixed to the sump by the help of snap fits.
The sump is fixed
2
to the inner tub by
the help of 5 PT
type screws as
shown in the
3
picture left.
The inner tub differs because of the change made for
the new sump, and sump connections .
.
Sump
Gasket
New filter support part is fixed to the sump
and inner tub by the screws numbered as 3,
4 and 5.
The drain hose is assembled to the
drain exit of the sump by using a
hose clamp