GE Profile 42 Owner's Manual And Installation Instructions page 34

Built-in side by side refrigerators
Table of Contents

Advertisement

Available languages

Available languages

Installation
Instructions
CONNECT
WATER SUPPLY
Check to make sure that
Master
Power
switch
is in the O (OFF) position,
I
• Locate
and bring
GE SmartConnect
T'_ t ubing
to the front
of the cabinet.
• Turn the water
on to flush
debris
from
line.
Run about
a quart
of water
through
tubing
into
a bucket,
then
shut off water.
Copper
Tubing
• Slip a 1/4" nut and ferrule
onto
end of
copper
tubing.
Insert
tube
into the union
fitting
on the unit and tighten
nut to union.
• Turn on the water
to check for leaks.
GE SmartConnect
TM
Tubing
• Insert
the molded
end of the tubing
into
the refrigerator
connection.
Tighten
the
compression
nut until
it is just hand tight.
• Tighten
one additional
turn
with
a wrench.
Overtightening
can cause leaks.
• Turn on the water
to check for leaks.
Note:
Make sure
excess tubing
length
does
not interfere
with
toekick
installation.
TURN ON THE POWER
• Set the Master
Power
switch
to the I (ON)
position.
• Check to make sure power
to refrigerator
is
on by opening
refrigerator
door to see if
interior
lights
are on.
Master
PowerSwitch
Water Filter
• The temperature
controls
are preset
at 37 °
for the Fresh Food
section
and 0 ° for the
Freezer
section.
• Allow
24 hours
to stabilize
before
making
adjustments.
34

Advertisement

Table of Contents
loading

This manual is also suitable for:

Profile 48

Table of Contents