Download Print this page

Kit Installation - GReddy Turbo Kit Installation Manual

96-98 nissan 240sx s14 (ka24de) td06-20g 8cm2
Hide thumbs Also See for Turbo Kit:

Advertisement

3. Kit Installation

3-1 Oil pan modification
1. Clean the oil pan.
2. Install the oil return pipe using the
provided spacer as shown.
3. Mark the oil pan to drill out for the
19mm hole.
4. Remove the oil return pipe and drill out
the marked hole.
5. Reinstall the oil return pipe and weld
the pipe to the oil pan.
6. Clean the welded area and paint to
prevent rusting.
7. Reinstall the oil pan on to the engine.
(Parts used #17, 18, 51, 52)
3-2 Thermo Cloth Installation
1. Wrap the AC line, O2 sensor wire with
the provided thermo cloth.
3-3 Replace Power Steering Hose
1. Cut the provided 16∅ hose to 400mm
and wrap it with thermo cloth.
2. Replace the power steering hose with
this hose.
3-4 Replace Stud Bolt
1. Remove the bottom stud bolt on the #3
port on the cylinder head and replace it
with the provided stud bolt.
(Parts used #42)
(Parts used #20, 27, 42)
(Parts used #54)
Spacer

Advertisement

loading