TYAN Transport GT20 (B2865 Service Manual page 28

Table of Contents

Advertisement

Rackmounting the Server
8. Draw out the middle rail to the latch position.
9. Lift the chassis and then insert the inner slide rails into
the middle rails.
10. Push the chassis in and press the latch key (A). Then
push the whole system into the rack (B).
Chapter 2: Setting Up
A
B
19

Advertisement

Table of Contents
loading

This manual is also suitable for:

Transport gt20B2865

Table of Contents