Craftsman 536.887993 Operator's Manual page 27

9 horsepower electric start dual stage
Table of Contents

Advertisement

Available languages

Available languages

_.'_o_
V:_ _ I my:_m_ll_,_l i _vA I_ _i i
11. Remove the three fasteners
that
hold the friction
wheel to the hub
(see Figure 34).
12. Remove the friction
wheel from the
hub. Slip the friction
wheel off the
hex shaft.
13. Assemble the new friction
wheel
onto hub with the fasteners re*
moved earlier.
14. Install the hex shaft and bearings
with the four bolts removed earlier
(see Figure 35).
Make sure the washers are prop*
erly installed in the original posi*
tion. Also, make sure the two
washers are properly aligned
with the actuator arms.
15. Make sure the hex shaft turns free-
]y.
16. Install the left wheel, axle, and
drive sprocket with the fasteners
removed earlier, install the chain
onto the drive sprocket (see
Figure 32).
17. Check the adjustment of the friction
wheel. See "How To Adjust The
Friction Wheel" in this section.
18. Make sure the friction wheel and the
disc drive plate are free from grease
or oil.
19. Install the bottom panel (see
Figure 31).
20. Tighten the bolts on each side of
the bottom
panel.
21. Install the right wheel to the axle
with the fasteners removed earlier.
22, Connect
the spark
plug wire,
Friction
Fasteners
Hub
Wheel
Hex Shaft
Fasteners
Figure 34
F-031098L
Actuator Arms
Bearings
\
Washer
27
Beanngs
/
Washer
Washer
Figure 35

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents