Frigidaire FAC12C2ABJW Instruction Manual page 15

Table of Contents

Advertisement

Available languages

Available languages

Drilling the Hole
Wall
1. Determine the position of the hole for
[Indoor unit i
_
the pipe using the installation
plate
and drill the pipe hole so that it is
titled slightly downward ..............
iii"_._...
_.
2, Always use a pipe cover with an
1"
opening when drilling a metal bar.
....
E
E
Connective pipe and drainage installation
[ Outdoor unit I
Drainage
1, Run the drain hose sloping
downward. Do not install the drain
hose as illustrated below,
2. When connecting extension drain
hose, insulate the connecting part
of extension drain hose with a
shield pipe, do not let the drain
hose slack.
Do not put the end
of drain hose into water.
Connective pipe
1. For the left-hand and right-hand
piping, remove the pipe cover from
the side panel. Explain to clients
that the pipe cover must be kept as
it may be used when relocate the air
conditioner to any other place.
P_pe cover
Pipe
Pipe cover
(right)
holder
(left)
2. For the rear-right-hand
and rear-left-
hand piping, install the piping as
shown. Bend the connective pipe to
be laid at 43mm height or less from
the wall. Fix the end of the
connective pipe.
Right piping
Right
back
piping
Indoor
unit
Connective
outline
pipe

Hide quick links:

Advertisement

Chapters

Table of Contents
loading

Table of Contents