What's New In This Document; Supported Hardware And Software - Brocade Communications Systems StoreFabric SN6500B Administrator's Manual

Brocade fabric os fcip administrator's guide v7.1.0 (53-1002748-01, march 2013)
Hide thumbs Also See for StoreFabric SN6500B:
Table of Contents

Advertisement

What's new in this document

Major new additions or deletions in this document support the following:
x
General
-
Removed all mention of FR4-18i blade since it is not supported as of this release.
Preface.
-
Removed FR4-18i from
Chapter 1
-
Removed FR4-18i from
Chapter 2
-
Added note under
"7800 switch license options"
7800 switch that has been partitioned for virtual fabrics. Removed requirement that 7800
upgrade license is required to enable Advanced FICON Acceleration License or CUP.
-
Under
"Creating an FCIP tunnel"
table for the following:
QoS priority percentages
Committed rate
Adaptive rate limiting
Keep-alive timeout
-
Added
"Firmware downloads"
page 8 to include this statement: "If FCIP Fibre Channel traffic is active on Fibre Channel
ports, the traffic will be impacted during a firmware download. "
-
Under
"Limitations using IPsec over FCIP tunnels"
only being supported on VE group 12-21 on FX8-24 blade to say that "Older versions of the
FX8-24 blade do not support IPsec on group 22-31. For these blades, a RASLOG warning
message will display that blade is not at correct version to support IPsec enabled tunnels
on VEs 22-31."
-
Under
"Enabling XISL for VE_Ports"
to four logical switches on the Brocade 7800, you cannot use these for XISLs because a
base switch cannot be created."
-
Under
"Virtual Fabrics"
7800 switch. Also added considerations and limitations for virtual fabrics for 7800 switch.
-
Under
"Limitations of port sharing"
disabling default switch on shared GbE interfaces between the default switch and other
logical switches.
-
Removed note that there are no addressing restrictions when using switches or blades
operating with Fabric OS v7.0.0 or later since. This was confusing since IP address limits
are defined for GbE, 10 GbE, and cross ports when in 10 Gbps mode.
-
Under
"Creating a multicircuit tunnel (example)"
figure titled "FCIP tunnel example with six circuits" describing circuits per tunnel
configured in example and requirements for maximum circuits per port on 7800 switch
and FX8-24 blade.

"Supported hardware and software"

"FCIP platforms and supported features"
on page 42, modified arguments in "Tunnel Options"
on page 10 under
on page 39, added note "Although you can create up
on page 56, added support for virtual switches and fabrics on
on page 57", added paragraph about effect of
on page 50, modified paragraph following
on page ix.
on page 1
on page 7 that FCR is not supported on a
"FX8-24 blade hardware overview"
on page 30, modified bullet about IPsec
Fabric OS FCIP Administrator's Guide
on
53-1002748-01

Advertisement

Table of Contents
loading

This manual is also suitable for:

DcxDcx 8510-8Dcx-4s7800Dcx 8510-4

Table of Contents