Slide the rails back into the chassis.
1.
Align the top right edge of the drawer with the flange at the top of the chassis.
2.
Align the four rails on the left side and bottom of the drawer bay.
3.
Push the drawer in about 25 cm (10 in).
4.
Removal and replacement procedures 34
Need help?
Do you have a question about the StorageWorks 9100 - Extreme Data Storage System and is the answer not in the manual?
Questions and answers