Managing the HP NetStorage 6000 Using Telnet
Scheduling Backup Jobs
From the Tape Backup main menu, select 2. Scheduling Backup to run backup jobs automatically on set
days of the week.
Enter the letter corresponding to the day of the week you wish to edit, or enter 1. Edit backup time to alter
the time of day scheduled jobs are executed.
Once you have selected a day of the week, you can either enter 1. Edit to change the job scheduled for that
day or enter 8. Delete to clear activity scheduled for that day. To edit the schedule for a day:
1. Enter the name of an existing job.
2. Enter Y in Create Arch Dir if you want a list of all files and directories backed up to be included on
the tape along with the data. The archive directory speeds up searches for files and directories in a
restore.
3. If desired, enter a comment to be included on the tape whenever the backup is executed.
10