TABLE OF CONTENTS Page I. Specifications..........................3 II. Preparation For Installation....................... 3 New Unit Inspection ........................3 Operation ............................ 3 Ducting Application ........................4 III. Installation ..........................4 Liquid Aerosol ........................... 5 Electrical ............................ 5 IV. Maintenance ..........................5 Cleaning............................. 5 Inspections ..........................
Trion representative. The unit can be either wall-mounted or chain-hung. Eyebolts can be supplied by Trion. NEW UNIT INSPECTION Control Switch (A): The control switch is located on Immediately, upon receiving the unit, carefully examine the cell access door. It controls the operation of the the package for damage during transit.
Capture hoods and duct design information may be obtained from the Industrial Ventilation Handbook or from your local Trion representative. To maintain the selected cleaning efficiency, it is...
A. All construction debris is removed from the ionizing- collecting cells, drain connections and ductwork. B. The drain line from the Trion drain basin is clear and completely connected to its point of termination. C. Supply line power is available and electrical wiring...
V. REPLACEMENT PARTS ORDERING INFORMATION The following pages contain exploded views and Bills of Material for the Trion T Series Air Cleaners. Use these pages to determine the part numbers of the items needed. To order parts contact your local Trion...
Page 7
Always unplug the unit while performing service Before performing any troubleshooting, ensure the within the cabinet. correct input line voltage is present. IF PROBLEM CANNOT DETERMINED CORRECTED - CONTACT YOUR LOCAL TRION REPRESENTATIVE OR CALL TRION CUSTOMER SERVICE AT 1-800-884-0002 FOR ASSISTANCE.
Need help?
Do you have a question about the Air Boss T5200 and is the answer not in the manual?
Questions and answers