Chapter 8 Creating Production Report
Sets the time not to be included in the calculation. This time is displayed on the
"Output" report as "Time Excluded".
218
Recess Time Setting
Target machine
Click and select the applicable machine for calculation.
Total recess time
Set the time not to be included in the day-to-day calculation during the designated
period.
Total maintenance time
Set the time not to be included in the calculation throughout the period.
BES-940BC • BES-1240BC