Download Print this page

COZY BBT54 Installation And Operation Instructions Manual page 15

Direct vent gas baseboard heater

Advertisement

inducer
S_ ffcb Closes
[
[(Ventor
Motor)
(Fal_ Pro'_ed)
NO
[ ockout
a{ker 3
attempts
SEQUENCE
OF OPERATION
Spark Ignition
[ nergized
15 Sec.
20 Sec
_al_e
opens
gls
[hermostat
flo\_
to buulel
satisfied
NO
_J
0_
STEP
#
1)
2)
3)
4)
5)
6)
7)
S)
9)
Thermostat
calls for heat.
Inducer
turns on.
Pressure
switch
closes.
Power to ignitor.
Gas flow to burner.
Burner ignition proven.
NOTE:
If there is a malfunction
in any of the above steps, the sequence
will stop at that point
and return to Step 2. If after 3 attempts
malfunction
still occurs, control
will go into lockout
mode for one hour.
This one hour lockout
can be bypassed
by resetting
the thermostat,
or
interrupting
power.
Thermostat
satisfied.
Gas valve closes.
lnducer
turns off.
HEATER
IS NOW IN STANDBY
MODE.

Advertisement

loading

This manual is also suitable for:

Bbt103Bbt104Bbt53