GE Model 42 Owner's Manual And Installation Instructions page 34

Table of Contents

Advertisement

Available languages

Available languages

Installation
Instructions
CONNECT
WATER SUPPLY
Check to make sure that
Master
Power
switch
is in the O (OFF) position,
I
• Locate
and bring
GE SmartConnect
T'_ t ubing
to the front
of the cabinet.
• Turn the water
on to flush
debris
from
line.
Run about
a quart
of water
through
tubing
into
a bucket,
then
shut off water.
Copper
Tubing
• Slip a 1/4" nut and ferrule
onto
end of
copper
tubing.
Insert
tube
into the union
fitting
on the unit and tighten
nut to union.
• Turn on the water
to check for leaks.
GE SmartConnect
TM
Tubing
• Insert
the molded
end of the tubing
into
the refrigerator
connection.
Tighten
the
compression
nut until
it is just hand tight.
• Tighten
one additional
turn
with
a wrench.
Overtightening
can cause leaks.
• Turn on the water
to check for leaks.
Note:
Make sure
excess tubing
length
does
not interfere
with
toekick
installation.
TURN ON THE POWER
• Set the Master
Power
switch
to the I (ON)
position.
• Check to make sure power
to refrigerator
is
on by opening
refrigerator
door to see if
interior
lights
are on.
Master
PowerSwitch
Water Filter
• The temperature
controls
are preset
at 37 °
for the Fresh Food
section
and 0 ° for the
Freezer
section.
• Allow
24 hours
to stabilize
before
making
adjustments.
34

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Model 42 and is the answer not in the manual?

This manual is also suitable for:

Model 48Profile 42Profile 48

Table of Contents