Mitsubishi Electric MN converter Operating Manual page 34

Electric air-conditioner network system
Hide thumbs Also See for MN converter:
Table of Contents

Advertisement

(4)Momentarily, the Connecting Information Screen
will appear.
(5)Click on
Information Screen.
(6)The message "Finish the Connecting Information"
will appear.
Click on
continue.
Click on
3.6.2 Screen Functions and Operation
(1) Double-click on the interlock unit and operation
group SC (remote controller), the Operation System
SC Connecting Information Screen (in case
operation group SC) will appear as a pop-up menu.
The screen displays addresses and attributes of each connected unit.
NOTE:
The BC controller(BC),Subsidiary outdoor unit(OS) are indicated in the outdoor unit column.
(2)"Menu Bar"
[Return] and [Help] appear in the menu bar.
Click on [Return] to end the Connecting Information Screen and return to the Main Screen.
Click on [Help] and the Help Screen appear.
- Click on "Contents" and the index for the Help Screen
appear.
- Click on "Back" and the unit returns to its previous
operating state.
- Click on "Print" and the currently displayed screen is
printed. (Caution: Do not print while on-line. There is a
chance that it could interfere with operation.)
- Click on "Term" and Explanation of Terminology
Screen appear.
Abbreviations, codes and other terms are explained on
the explanation of terminology screen.
to end the Connecting
to end or click on
and the Main Screen appears.
3.6.2(2)
to
33
(5)

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

G-50aMaintenance tools for mn converter & g-50a

Table of Contents