Mitsubishi Electric MN converter Operating Manual page 61

Electric air-conditioner network system
Hide thumbs Also See for MN converter:
Table of Contents

Advertisement

3.12.4 Error notification testing
After setting the MN Converter to remote error notification mode, run the error notification test to check that
notification is implemented correctly.
Caution:
After specifying the error notification settings, always run the error notification test to check that notification
is correctly provided to the correct addresses during the error notification test, always check that errors are
posted correctly on the remote monitoring PC.
NOTE:
Before running the error notification test, check whether the software running on the remote monitoring PC
is the dedicated server software or another software tool. Then refer to "3.12.8 Option settings" to ensure
that you specify the correct server or tool settings.
(1) In the Error notification mode setting/cancellation
screen, click [Test report].
(2) The test notification begins.
A confirmation window is displayed.
Check the contact number and then click [Yes].
NOTE:
When error notification is in progress, the following messages are displayed, and the test report cannot be
performed. Please wait and try again.
In addition, when a modem is not connected, the following messages are displayed.
Please try again after connecting a modem definitely.
(3) After a few moments, the results are displayed.
Check the message and then click [OK].
[In the case of success]
[In the case of failure]
(* The actual message differs depending on the error.)
60

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

G-50aMaintenance tools for mn converter & g-50a

Table of Contents