Hitachi CPX2 User's Manual And Operating Manual page 104

Hide thumbs Also See for CPX2:
Table of Contents

Advertisement

2. Equipment connection and network setting
2.5 Configuring and controlling the projector via a web browser (Continued)
2.5.6 Schedule Setting (Continued)
The daily and weekly event items are shown below.
Item
Schedule
Schedule List
The specific date event items are shown below.
Item
Schedule
Date (Month/Day)
Schedule List
Click the [Apply] button to save the settings.
To add additional functions and events click the [Add] button and set the following
items.
Item
Time
Command
[Parameter]
Power
Input Source
Display Image
Click the [Register] button to add new commands to the Schedule List.
Click the [Delete] button to delete commands from the Schedule List.
30
Daily & Weekly Description
Click the [Enable] check box to enable the scheduling.
Displays the current schedule.
Specific date (No.1-5) Description
Click the [Enable] check box to enable specific date (No.1-5)
scheduling.
Configures the Month and date.
Displays the current specific date (No.1-5) schedule.
Configures the time to execute commands.
Configures the commands to be executed.
Configures the parameters for power control.
Configures the parameters for input switching.
Configures the parameters for display of transfer image data.
Description

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cpx6Cpx2wf

Table of Contents