3.2 Synchronizing the Hook and Needle Bar Movement
1
2
8
The synchronization of the hook movement to the movement of the
needle bar is made with gauge 1 and timing pin 3.
3
Caution Risk of Injury !
Turn the main switch off.
Synchronize the hook and needle bar movement only with the main
switch turned off.
–
Insert the timing pin 3 into the hole in the housing on the machine head.
–
Turn the handwheel in the direction of run until the timing pin 3 can
be felt to have caught in the groove on the arm shaft crank.
–
Tilt the machine head to the side.
–
Insert gauge 1 through the hole in the housing.
With a correct setting it must be possible to push gauge 1 into the
recess on the crank 2.
To correct:
–
Remove the machine head cover.
–
Loosen the clamping screws 5 on the timing belt pulley 4.
–
Turn the handwheel in the direction of run until the gauge 1 can be
pushed into the recess on the crank 2.
–
Tighten the clamping screws 5.
–
Replace the machine head cover again.
4
5