Main Unit; Rear Stabilizer Tube - Schwinn 122 Parts And Assembly Manual

Upright exercise bike
Hide thumbs Also See for 122:
Table of Contents

Advertisement

Each step of the assembly process has been broken down into 7 easy-to-follow
stages. Please take just a few moments to read over these instructions to
familiarize yourself with the process to make assembly quick and trouble-free.
Attach Front and Rear Stabilizer Tubes to Main Unit
Assembly hardware required:
1. Attach the FRONT STABILIZER TUBE (#12) to the MAIN UNIT (#14) by
inserting the two FLAT HEAD SCREWS (#11) into the holes in the stabilizer and
front of the main unit. Make sure that the wheels on the front stabilizer tube are
facing away from the main unit. Tighten bolts securely
2. Attach the REAR STABILIZER TUBE (#15) to the MAIN UNIT (#14) by
inserting the two FLAT HEAD SCREWS (#11) into the holes in the stabilizer and
rear of the main unit. Make sure that the leveler adjustments on the rear stabilizer
tube are facing up. Tighten bolts securely.
Attach Pedals to the Crank Arms on Main Unit
e-mail from: Keith Weier
Assembly Stage #1
(4) Flat Head Screw 8x16L (item #11)
Assembly Stage #2
date: 7/14/2005
page:8/16

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

123

Table of Contents