Installation Steps
For ease of installation and use of your Leaf/Soil Station, please follow steps in the
order presented.
If you encounter difficulties or have questions about your station, the following
additional information may be helpful:
Preparing the Leaf/Soil Station
The following illustrations show the location of the transmitter ID DIP switches, the
battery mounting location, the modular connectors used by the leaf wetness sensors,
and the terminal blocks used to connect the soil moisture sensors and temperature
probes.
3