Final Checks; Care And Maintenance; View From Top Of Base Pan - Bryant 598B Installation And Start-Up Instructions Manual

Two-speed puron plus air conditioning unit
Table of Contents

Advertisement

Fig. 14—View from Top of Base Pan
XIII. FINAL CHECKS
IMPORTANT: Before leaving job, be sure to do the following:
Control Box
Side of Unit
THERMISTOR PLACED
UNDERNEATH BASE PAN
(ATTACHED TO BASE PAN
WITH ADHESIVE)
A02218
—14—
1. Ensure that all wiring and tubing is secure in unit before
adding panels and covers. Securely fasten all panels and
covers.
2. Tighten service valve stem caps to 1/12 turn past finger
tight.
3. Leave Owner's Manual with owner. Explain system opera-
tion and periodic maintenance requirements outlined in
manual.
4. Fill out Dealer Installation Checklist and place in customer
file.

CARE AND MAINTENANCE

For continuing high performance and to minimize possible equip-
ment failure, periodic maintenance must be performed on this
equipment. Frequency of maintenance may vary depending upon
geographic areas, such as coastal applications.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents