OPTIONAL PARTS
HANDLE INSTALLATION
Install the right and left handles on the generator upper frame using
the handle brackets and four flange bolts.
TORQUE:
17 22 lbf·ft (24 29 N·m , 2.4 3.0 kgf·m)
LEFT UPPER HANDLE ASSY
LEFT HANDLE BRACKET
70
8 16 mm FLANGE BOLT (4)
RIGHT UPPER HANDLE ASSY
RIGHT HANDLE
BRACKET