IBM 7379E2U Installation And User Manual page 73

User manual
Hide thumbs Also See for 7379E2U:
Table of Contents

Advertisement

Power-supply cage
Power-supply
cage handle
Locating tabs
3. Rotate the power-supply cage handle down until the handle tip engages the
notch in the front latch bracket; then, lower the handle until it locks in place.
4. Install and lock the left-side cover (see "Completing the installation" on page
96).
5. Install the hot-swap power supplies.
6. Reconnect the external cables and power cords; then, turn on the attached
devices and turn on the server.
Power-supply cage
front latch bracket
Power supply
cage closed
Chapter 2. Installing optional devices
Locating tabs
Notch
57

Advertisement

Table of Contents
loading

This manual is also suitable for:

System x3400 m3 7378System x3400 m3 7379

Table of Contents