Chapter 4: Setup And Configuration; System Setup; Diagnostic Tests; Upon Power On - Accton Technology SuperSmart EtherHub-16se Installation Manual

Advanced 16-port 10base-t smart ethernet hub
Table of Contents

Advertisement

System Setup

Chapter 4:
Setup and Configuration

Diagnostic Tests

Upon Power On

Upon power on, the system performs an internal self-diagnostic
test of major hub components. If any component fails during
the test, the hub will try to complete the diagnostic procedure.
Otherwise, the system will hang. For related information, refer
to
Diagnostic Test LED Indicators
The following table shows the components to be tested.
Test Function/Component
CPU
ROM
RAM
Serial communication controller
Hub control 1
Hub control 2
Timer

During Normal Operation

You can use the Configure button any time you want the
system to perform a diagnostic test. However, when testing
begins, the system leaves normal operation. If no problem is
encountered by diagnostics, the system automatically returns to
normal operation.
in Chapter 2.
4-1

Advertisement

Table of Contents
loading

Table of Contents