Installing A Hot-Swap Fan - Lenovo TD100 - THINKSERVER 2.0G 2GB DVD 670W 6X7 TFF User Manual

Types 4203, 4204, 4205, 4206, 6398, 6399, 6419, and 6429
Table of Contents

Advertisement

10. Connect the power cord.
If you have other options to install or remove, do so now; otherwise go to
"Completing the installation" on page 55.

Installing a hot-swap fan

To replace a hot-swap fan, complete the following steps:
1. Review the safety information that begins on page v and "Installation guidelines"
2. Remove the side cover (see "Removing the side cover" on page 25).
3. Take your finger and slide the orange release tab in the direction indicated by
7. Press down on the orange release lever and push the power supply toward the
front of the chassis until it locks into place.
8. Connect one end of the power cord into the connector on the back of the
power supply and connect the other end of the power cord into a properly
grounded electrical outlet.
9. Make sure that both the ac and dc power LEDs on the rear of the power
supply are lit, indicating that the power supply is operating correctly.
on page 20.
Attention:
Static electricity that is released to internal server components
when the server is powered-on might cause the server to halt, which could
result in the loss of data. To avoid this potential problem, always use an
electrostatic-discharge wrist strap or other grounding system when working
inside the server with the power on.
Attention:
To ensure proper system cooling, do not leave the cover off the
server for more than 2 minutes.
the arrow on top of the fan to unlock the fan-locking handle. Grasp the fan
handle 1 and pull the fan out of the fan cage assembly.
Chapter 2. Installing optional devices
49

Advertisement

Table of Contents
loading

This manual is also suitable for:

Thinkserver td100 seriesThinkserver td100x

Table of Contents