Pre-installation Survey
Delivery Survey
•
Special security requirements applicable to the facility, such as security clearance
Figure 3-1
Delivery Survey (Part 1)
Is dock large enough for a semitrailer?
Circle the location of the dock and give street name if different than address.
Circle the location of access door and list street name if different than address.
List height
List special permits (if required) for street delivery.
Permit type:
38
DELIVERY CHECKLIST
DOCK DELIVERY
North
West
South
STREET DELIVERY
North
West
South
and width
of access door.
Yes
No
East
East
Agency obtained from:
60SP018A
12/7/99
Chapter 3
Need help?
Do you have a question about the Rp7410 - Server - 0 MB RAM and is the answer not in the manual?