HP Rp7410 - Server - 0 MB RAM Manual page 56

Site preparation guide
Hide thumbs Also See for Rp7410 - Server - 0 MB RAM:
Table of Contents

Advertisement

Pre-installation Survey
Site Inspection
Table 3-2
Site Inspection Checklist (Continued)
Please check either Yes or No. If No, include comment# or date
22.
Is there an emergency power shut-off switch?
23.
Is there a telephone available for emergency
purposes?
24.
Is there a fire protection system in the
computer room?
25.
Is antistatic flooring installed?
26.
Are there any equipment servicing hazards
(loose ground wires, poor lighting, etc.)?
Cooling
No.
Area or condition
27.
Can cooling be maintained between 20 C and
25 C (up to 5000 ft.)? Derate 1 C/1000 ft.
above 5000 ft. and up to 10,000 ft.
28.
Can temperature changes be held to 10 C per
hour with tape media? Can temperature
changes be held to 20 C per hour without tape
media?
29.
Can humidity level be maintained at 40% to
60% at 35 C non-condensing?
30.
Are air conditioning filters installed and clean?
Storage
No.
Area or condition
31.
Are cabinets available for tape and disc media?
32.
Is shelving available for documentation?
Training
No.
Area or Condition
33
Are personnel enrolled in the System
Administrator's Course?
34
Is on-site training required?
36
Comment
or Date
Yes
No
Yes
No
Chapter 3

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rp74059000 rp7410

Table of Contents