Chapter 2 Installation And Basic Operation; Unpacking The Pass Through Module; Insertion And Removal Of The Ptm; Ptm Insertion - Dell PowerEdge M420 User Manual

16 port 10gbe pass through module (xaui)
Hide thumbs Also See for PowerEdge M420:
Table of Contents

Advertisement

Rev 1.0
2
Installation and Basic Operation
2.1

Unpacking the Pass Through Module

Before you install your new PTM, unpack it and make sure that there is no visible damage that
may have occurred during shipping. Your package should contain the following items:
• Dell -10GbE Pass Through Module for Blade Servers
• This User's Manual
The PTM is shipped without optical modules.
If anything in the package is damaged or missing, please contact your customer representative
immediately.
2.2

Insertion and Removal of the PTM

The Dell 10Gb Ethernet Pass Through II may be plugged into fabric slots B1, B2, C1, and C2.
Determine which slot to use, based on desired system configuration.

2.2.1 PTM Insertion

Insert the PTM into the chassis as shown in the following diagram:
8
Figure 3: Dell Chassis Slots for the PTM
Slot B1
Slot C1
Slot C2
Slot B2
Installation and Basic Operation

Advertisement

Table of Contents
loading

Table of Contents