Figure 1-8. Installing The Cable-Management Arm - Dell PowerEdge 2800 Hardware Installation Manual

Rack installation guide
Hide thumbs Also See for PowerEdge 2800:
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 1

Figure 1-8. Installing the Cable-Management Arm

latch on end of slide
assembly
latch on inner
segment of slide
assembly
tab on front end
4
If applicable, install the system status indicator cable plug into its connector (see Figure 1-9).
5
Open the wire covers on the cable-management arm by lifting the center of the wire over the
top of the embossed round button on the front of the forward part of the arm and lifting the
wire over the top of a similar round button on the back part of the arm.
The wire cover swings open to enable cables to be routed within the arm.
6
Route the system status indicator end of the cable through the cable-management arm, and
install the indicator in its slot at the back end of the cable-management arm (see Figure 1-9).
tab on back end
cable-management arm
Rack Installation Guide
1-17

Advertisement

Table of Contents
loading

Table of Contents