Installing The Cable-Management Arm - Dell PowerEdge 2800 Hardware Installation Manual

Rack installation guide
Hide thumbs Also See for PowerEdge 2800:
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 1
8
Push in and turn the captive thumbscrews on each side of the front chassis panel to secure
the system to the rack.
NOTE:
locking mechanism, and then pull the system forward.

Installing the Cable-Management Arm

NOTICE:
viewed from the back).
To install the cable-management arm on the system, perform the following steps:
1
Facing the back of the rack cabinet, locate the latch on the end of the slide assembly.
2
Push the tab on the back end of the cable-management arm into the latch on the end of
the slide assembly (see Figure 1-8).
The latch clicks when locked.
3
Push the tab on the front end of the cable-management arm into a mating latch on the inner
segment of the slide assembly (see Figure 1-8).
The latch clicks when locked.
1-16
Rack Installation Guide
To remove the system from the slide assemblies, press down on the thumbpads of the system
The cable-management arm can only be installed on the right side of the rack cabinet (as

Advertisement

Table of Contents
loading

Table of Contents