Recommended Tools and Supplies
You need the following tools and supplies to install the system in a two-post
open-frame relay rack:
•
#2 Phillips screwdriver
•
11/32-inch wrench or nut driver (if changing to a flush-mount configuration)
•
Masking tape or felt-tip pen to mark the mounting holes
Rack Kit Contents
The two-post rack kit includes the following items (see Figure 1-12):
•
One pair of slide assemblies (two-post)
•
One stiffening bracket
•
One cable-management arm
•
One status indicator cable
•
Twelve 12-24 x 0.5-inch pan-head Phillips screws
•
Tie-wraps (not shown in Figure 1-12)
F i g u r e 1 - 1 2 .
Tw o - P o s t R a c k K i t C o m p o n e n t s
slide assemblies (2)
status indicator cable
stiffening
bracket
12-24 x 0.5-inch pan-head
Phillips screw (12)
cable-management arm
Rack Installation Guide
1-19