Steps 12-13 Important Information - Chamberlain HCT Instruction Manual

High traffic commercial door and gate operator
Table of Contents

Advertisement

I M P O R T A N T I N F O R M A T I O N
STEP 12
CENTER
SAFETY
EXIT
W4
G B
A
SYSTEM ON
MS LINK
SENSORS
1
3
1
3
FIRE
STRIKE
DEPT.
OPEN
EXIT
SAFETY
LOOP
LOOP
STEP 13
Installers are required to adhere to this procedure: The UL required Warning Signs must be installed
in plain view and on both sides of each commercial gate installed. Each sign is made with fastening
holes in each corner and should be permanently secured in a suitable manner.
DC-BACKUP
TIMER
POWER
60
3
OVERLOAD
1
3
OFF
ON
MADE IN USA
OPEN LEFT
OPEN RIGHT
RADIO
GATE
RECEIVER
LOCKED
CENTER
RESET
LOOP
MOTOR
Make sure the system is
14
MER
60
1
3
OFF
ON
OPEN LEFT
OPEN RIGHT
RADIO
"OPEN TO
LEFT"

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Hct 501130

Table of Contents